Issue 03 · Dubai · Landmark · Sheikh Zayed Road

Museum of the Future

A stainless-steel torus of calligraphy, open to a void, closed for a time.


The Museum of the Future at night, its stainless-steel torus covered in illuminated Arabic calligraphy, with the glass entrance glowing beneath the void of the ring.
Photo: Aleksandr Sigachev · Source: Wikimedia Commons · CC BY-SA 4.0

The Museum of the Future was designed by Killa Design and engineered by Buro Happold. The official platform of the UAE Government records that it was inaugurated on 22 February 2022. The museum’s own building page gives its height as 77 metres, its floor area as 30,548 square metres, and its façade as 1,024 pieces of stainless steel, made with a robot-assisted process, covering 17,600 square metres. That façade is a canvas for quotations of Sheikh Mohammed bin Rashid Al Maktoum, rendered in the calligraphy of Mattar bin Lahej. The museum describes a symbolic form: the circular building for humanity, the green mound it sits on for the earth, and the void in the ring for the unknown future.

The building is temporarily closed. The museum’s official FAQ states that it closed to visitors at the beginning of September 2026, while exhibitions, narrative and interior spaces are wholly reimagined, and that it is set to reopen in the first quarter of 2027. The same FAQ says the exterior structure will not change. This entry, written during the closure, is therefore a reading of the architecture that remains in place, not of rooms that are being replaced.

← Back to Issue 03